• Home
  • About Us
  • Vinyl
    • Types
      • Vinyl Sheet
      • Birch Vinyl
      • Hickory Vinyl
      • Vinyl Tiles
      • Cherry Vinyl
      • Ebony Vinyl
      • Vinyl Plank
      • Ash Vinyl
      • Maple Vinyl
      • Oak Vinyl
      • Mahogany Vinyl
      • Pine Vinyl
      • Teak Vinyl
      • Walnut Vinyl
    • Colours
  • Outdoor
    • Types
      • Artificial Grass
      • Timber Decking
      • WPC Decking
  • Parquet
    • Types
      • Solid & Engineered Wood
      • Maple Parquet
      • Oak Parquet
      • Pine Parquet
      • Mahogany Parquet
      • Cherry Parquet
      • Teak Parquet
      • Walnut Parquet
    • Patterns
      • Basket Weave Parquet
      • Versailles Parquet
      • Herringbone Parquet
      • Chevron Parquet
  • Projects
    • Residential
      • Bedroom Vinyl
      • Bathroom Vinyl
    • Commercial
      • Hospital Vinyl
  • Contact Us
Flooring Specialist
Call Us +65 8782 9202
  • Home
  • About Us
  • Vinyl
    • Types
      • Vinyl Sheet
      • Birch Vinyl
      • Hickory Vinyl
      • Vinyl Tiles
      • Cherry Vinyl
      • Ebony Vinyl
      • Vinyl Plank
      • Ash Vinyl
      • Maple Vinyl
      • Oak Vinyl
      • Mahogany Vinyl
      • Pine Vinyl
      • Teak Vinyl
      • Walnut Vinyl
    • Colours
  • Outdoor
    • Types
      • Artificial Grass
      • Timber Decking
      • WPC Decking
  • Parquet
    • Types
      • Solid & Engineered Wood
      • Maple Parquet
      • Oak Parquet
      • Pine Parquet
      • Mahogany Parquet
      • Cherry Parquet
      • Teak Parquet
      • Walnut Parquet
    • Patterns
      • Basket Weave Parquet
      • Versailles Parquet
      • Herringbone Parquet
      • Chevron Parquet
  • Projects
    • Residential
      • Bedroom Vinyl
      • Bathroom Vinyl
    • Commercial
      • Hospital Vinyl
  • Contact Us
During renovation, which installation come first, floor or door?

During renovation, which installation come first, floor or door?

As a general procedure, the floor is first installed follow by the door.  The process may be reverse if we look at different perspective. 
1. From the perspective of installation fitting: 
After the flooring completed, follow with door installation than follow by floor skirting which require cutting and fixing to match with the door frame.  This will ensure a better fitting finishing with minimum finishing touches. 

2. From the perspective of finished flooring protection: 
Then the door to be install first.  During the door installation process, power tools will be used for drilling and nailing, glass glue and there will be dust during installation.  As the whole process is operated on a concrete flooring instead of finished floor, this will avoid any damage or scratches onto the finish floor. 


Each has its own advantages and disadvantages, depending on the situation; 
1. If there are more than 1 type of flooring layout.  Living room install tiles and bedroom install wooden floor design, than one can consider to install the door first. 

 2. If the flooring materials has arrived in advance, but the door has to wait for a while, in order not to delay the renovation, it is recommended to install the flooring first. 
 

1061-flooring-specialist-logo-v3.png

CONNECT WITH US

 

PHONE: +65 8782 9202

 

FAQ | BLOG | CONTACT US


@2021 Flooring Specialist Singapore 
All Rights Reserved